Marine
Dock construction, marina expansion, seawall design, mooring systems. Built for the developers and contractors moving Florida's working waterfront forward.
- Example project:
- Marina expansion
- Agencies:
- USACE, FDEP
We know the agencies. We move the permits. We keep your build on schedule.
We'll ask about project type, location, timeline, and current permit status.
FDEP · USACE · SWFWMD · SFWMD · CCCL · 22 years of Florida agency work
Services
Permitting, design, and construction administration. From pre-application through closeout.
Dock construction, marina expansion, seawall design, mooring systems. Built for the developers and contractors moving Florida's working waterfront forward.
Shoreline stabilization, CCCL permitting, beach restoration, dune protection. The technical work that keeps Florida's coast standing through the next storm.
Site development, stormwater, environmental permitting, water management district coordination. Engineering that gets the project entitled and through the gate.
Why Blue Arc
01
Twenty-plus years of FDEP, USACE, and Water Management District work behind us. When a county reviewer wants something different, we know what they want before they ask.
02
The permit timeline is the build timeline. We treat it that way. Pre-application meetings, proactive submittals, weekly check-ins on every active file.
03
Same-day callbacks. Transparent status updates. When something goes sideways, we tell you first.
The Team
Not a holding company. The people running each Blue Arc project are the people whose names are on the door.
President
22 years operating Florida engineering. Marine, coastal, and civil project leadership across Southwest Florida.
[PE #TBD — FL] · Marine / Coastal / Civil
Managing Partner
Operations and client delivery. Keeps the schedule, the agencies, and the build aligned across every active file.
Operations · Client Delivery
Principal Engineer, PE
Front-of-house engineering. Permit submittals, agency pre-application work, and the technical face of every project.
[PE #TBD — FL] · Marine / Coastal Permitting
Featured Project
[Location TBD, Southwest Florida] · [Year]
The challenge
[Placeholder — verify with Kelly] A two-county jurisdictional gap between FDEP and the local water management district stalled the original permit for 14 weeks. The build crew had been demobilized twice. Owner was facing seasonal weather windows closing.
What Blue Arc did
[Placeholder — verify with Kelly] Re-scoped the submittal package for parallel review across three agencies. Ran weekly pre-application calls. Translated agency feedback into actionable redlines within 48 hours of receipt.
The result
[Placeholder — verify with Kelly] Final permit issued 6 weeks after re-engagement. Build crew remobilized inside the original tide window. Owner protected the seasonal opening date.
Permit cycle
14 → 6
weeks [verify]
Agencies coordinated
3
parallel review [verify]
Schedule risk removed
$[X]M
build value [verify]
More Projects
Coastal · Shoreline stabilization
[Placeholder — verify with Kelly] CCCL-permitted shoreline armoring across [X] linear feet. FDEP coordination resolved a contested set-back ruling that had blocked construction for [Y] months.
Linear feet
[X]
Permit cycle
[Y] wk
Agencies
[Z]
Civil & Environmental · Site permitting
[Placeholder — verify with Kelly] Stormwater and environmental permitting for a [X]-acre development. SWFWMD and county reviewer coordination kept the project entitled inside the original closing window.
Acres
[X]
Permit cycle
[Y] wk
Agencies
[Z]
Florida agencies we work through
We have a different conversation for that. If you own a Florida engineering firm and you're starting to think about what comes next, the Sell Your Firm page is where to look.
See the acquisitions path →Tell us what you're trying to get permitted. We'll respond within one business day.
Request a Project Consultation